When you install an AG52 on powered equipment, you utilize the power interface from the asset using the powered AG cable harness with power and auxiliary inputs (for engine hours). After you connect the asset gateway to power, it will operate in real time. If power is not available from the asset, the AG will power from the internal battery in power-saving mode. The AG can function on an internal battery for up to 12 months.
Review the Equipment and Dry-Van Trailer Cable Matrix for Powered Asset Gateways (AGs) to ensure you obtain the appropriate cable for your configuration:
AG52 installations on powered equipment using CBL-AG-BEQP cable provides ability to monitor equipment with two digital inputs. To install the AG52 on a powered equipment using CBL-AG-BEQP:
-
Activate the device in your dashboard if you have not already done so.
Log into the Samsara dashboard or go to https://cloud.samsara.com/activate. You can also follow the link in your
Order Shipped
email. -
Turn off the power to the powered equipment.
-
Select the desired mounting location.
-
Plug the cable into the AG and twist to lock.
After connection, the AG will connect to the cloud and the LED will turn green.
-
If the AG will be installed at a hazardous location, first attach the mounting plate to the mounting surface. Then, attach the cover to the AG.
-
Attach the AG to the asset using the provided screws and tightening to no more than 7 kgf-cm.
Caution
Installation using an incorrect screw size may damage the AG. If you choose to fasten the device with your own screws, use the following recommendations for screw size to avoid damage to the device mounting tabs:
-
Screw size: #6 (Imperial), M3.5 (Metric)
-
Shank diameter: </= 3.55mm (0.14 in)
-
Head diameter: </= 8.10mm (0.32 in)
-
-
Connect the wires on the other end of the cable to the equipment using the following pinout as a guide. Cap any unused wires.
Wire
Instructions
Ground (black)
Using a multimeter, verify a ground point such as a metal stud or bolt that makes direct contact to the metal chassis.
Power source (red)
Connect to a key-switched power source, such as an hour meter or, for internal combustion engines, an oil pressure switch.
For hazardous installations: Wire the included 2A fuses between cable and power source.
Input 1 (green/white)
Connect to input for tracking hours of operation, such as an hour meter or oil pressure switch.
Input 2 (blue/white)
Connect to input for tracking productivity or alerts, such as a hydraulic solenoid on a belt loader.
Output (orange)
Reserved for future use.
CAN Lo (green) / CAN Hi (yellow)
For AG26 only - not supported.
-
Turn on power to the powered equipment.
-
(Optional) Use the provided zip ties to ensure that the cable does not obstruct activity.
-
Complete the AG52 Device Setup.
-
Verify successful connection in the Samsara dashboard (Overview > Assets > Equipment).
AG52 installations on powered equipment using CBL-AG-BPWR cable provides the ability to monitor equipment with a single digital input. To install the AG52 on a powered equipment using CBL-AG-BPWR:
-
Activate the device in your dashboard if you have not already done so.
Log into the Samsara dashboard or go to https://cloud.samsara.com/activate. You can also follow the link in your
Order Shipped
email. -
Choose a location for installation depending on asset type and use case.
-
Attach the gateway to the asset using the provided screws. If you choose to fasten the device with your own screws, use the following recommendations for screw size to avoid damage to the device mounting tabs:
-
Screw size: #6 (Imperial), M3.5 (Metric)
-
Shank diameter: </= 3.6mm (0.13 inch)
-
Head diameter: </= 8mm (0.31 inch)
-
To purchase additional screws, visit the following recommended supplier websites: Metric, Imperial, rivet style, self-drilling/tapping
-
-
Plug the cable into the AG and twist to secure.
-
Connect the wires on the other end of the cable to the connector:
-
Connect the White wire (ground) to negative.
-
To provide continuous power to the AG, connect the Blue wire (ABS/Constant Power) to 9-31 VDC. Alternatively, to power the AG only while the equipment is powered on, connect the Blue wire to the switched power.
-
Cap the unused Brown wire (head/tail lights).
-
(Optional) To track a digital state of the asset, such as synthetic engine hours using ignition state or to track other digital states, connect the Green/White wire (Input 0) to the desired source. Cap this wire if not used.
To verify electronic component compatibility, review the AG52 Data Sheet (PDF).
-
Cap any unused wires.
-
-
(Optional) Use the provided zip ties to ensure that the cable does not obstruct activity.
-
Complete the AG52 Device Setup.
-
Verify successful connection in the Samsara dashboard (Overview > Assets > Equipment).
Note
If you observe a cable error when you install the AG with the installer app, disconnect and reconnect the cable to the AG. Ensure the cable is correctly aligned with the 7-way connector and securely locked onto the asset gateway.
Comments
0 comments
Please sign in to leave a comment.